Updated: Aug 11, 2026
No. of Questions: 67 Questions & Answers with Testing Engine
Download Limit: Unlimited
The comprehensive Exam4Labs Construction-Manager valid study torrent can satisfy your needs to conquer the actual test. Construction-Manager free demo questions allow you to access your readiness and teach you what you need to know to pass the Construction-Manager actual test. With the CMAA Construction-Manager test engine, you can simulate the real test environment. We ensure you 100% pass with our Construction-Manager training torrent.
Exam4Labs has an unprecedented 99.6% first time pass rate among our customers.
We're so confident of our products that we provide no hassle product exchange.
| Certification Vendor: | CMAA (Construction Management Association of America) |
| Exam Name: | Certified Construction Manager Examination |
| Exam Number: | CCM |
| Passing Score: | 67% |
| Available Languages: | English |
| Exam Price: | $340 (CMAA member) / $440 (non-member) application fee + $290 exam fee |
| Exam Duration: | 240 minutes |
| Related Certifications: | Certified Associate Construction Manager (CACM) |
| Certificate Validity Period: | 3 years |
| Real Exam Qty: | 175 (150 scored, 25 unscored pilot items) |
| Exam Format: | Multiple-choice, Computer-based test (CBT) |
| Recommended Training: | CCM Build Up Course Professional CM (PCM) Course |
| Exam Registration: | Official Application Portal PSI Exam Scheduling |
| Sample Questions: | CMAA Construction-Manager Sample Questions |
| Exam Way: | Online remote proctored or in-person at PSI testing centers |
| Pre Condition: | Minimum 48 months of responsible-in-charge construction management experience; relevant bachelor's degree reduces required experience; references and application documentation required |
| Official Syllabus URL: | https://www.cmaanet.org/certification/ccm |
| Section | Weight | Objectives |
|---|---|---|
| Sustainability | 5% | - Lifecycle assessment - Green building principles - Environmental compliance - Resource efficiency |
| Professional Practice | 10% | - Leadership and communication - Professional development - Ethics and standards - Legal and regulatory framework |
| Technology | 5% | - BIM and digital tools - Emerging technologies - Data management and analytics - Project management software |
| Cost Management | 10% | - Estimation and budgeting - Earned value management - Financial reporting - Cost control and forecasting |
| Risk Management | 10% | - Monitoring and control - Identification and assessment - Mitigation and response planning - Insurance and liability |
| Safety Management | 10% | - Incident investigation - Safety planning and training - Regulatory compliance - Hazard identification and control |
| Time Management | 10% | - Critical path method - Schedule control - Scheduling techniques - Resource allocation and leveling |
| Contract Administration | 10% | - Claims and dispute resolution - Contract types and procurement - Negotiation and formation - Change order management |
| Quality Management | 10% | - Continuous improvement - Planning and standards - Quality assurance and control - Compliance and audits |
| Program & Project Management | 20% | - Project initiation and planning - Scope management - Lifecycle management - Stakeholder management |
1. An agency CM is representing the public owner of a large, complex project with numerous site challenges.
The owner has received numerous differing site condition claims on previous projects on this site. The agency CM has reviewed the bid documents and believes the site challenges are clearly and sufficiently detailed for bidders. This is a design-bid-build, lump sum procurement. The apparent low bid is more than 10% lower than the next lowest bid, and the owner is very concerned that the apparent low bidder has not included the cost of mitigating the site challenges in its bid. What should the agency CM do?
A) Conduct a post-bid interview with the apparent low bidder to determine if the bidder has a clear understanding of the site challenges.
B) Make the recommendation to the owner to reject all bids and re-advertise the project.
C) Conduct a post-bid conference to see if all bidders included the cost of mitigating the site challenges in their bids.
D) Ask the designer to verify that the technical specifications describing the site challenges in sufficient detail.
2. It is ideal for the CM to assist in mitigating potential impacts and unforeseen issues that may develop as early as the
A) post-construction phase.
B) construction phase.
C) design phase.
D) pre-design phase.
3. While conducting an inspection of the work in progress for a design-bid-build project, a CM notices that some of the completed work does not conform to the construction documents. The FIRST thing the CM should do is
A) document the non-conforming work and distribute the documentation to the contractor, design professional, and client.
B) discuss the concerns with the owner.
C) schedule a meeting with the design professionals and the client to discuss the issues.
D) direct the contractor to correct the non-conforming work.
4. A CM is providing support on a $150 million construction project. The agency has a well-developed safety program; however, the contractor is planning to use an innovative, high-risk method for constructing the project. To minimize the owner's risk, the CM should recommend that the owner
A) ensure they have a contractor-controlled insurance program (CCIP) to cover the safety risk for the project.
B) modify the CM contract to include safety management to protect the owner's interests.
C) provide a safety coordinator to perform the necessary project safety functions on behalf of the contractor.
D) have the contractor submit a safety management plan for review and approval by the owner.
5. = P × [(C + T + Q) + 3]
P is Probability
C is Cost
T is Time
Q is Quality
This equation best describes a(n)
A) risk variable score.
B) overall risk score.
C) Monte Carlo simulation equation.
D) cost time quality evaluation.
Solutions:
| Question # 1 Answer: D | Question # 2 Answer: D | Question # 3 Answer: A | Question # 4 Answer: D | Question # 5 Answer: B |
Exam4Labs Construction-Manager practice questions are really so great.
The Construction-Manager dump questions are exactly the same as the real exam subjects.
It is my strong recommendation to all of you to use Exam4Labs Construction-Manager test engine for the preparation of your Construction-Manager exam.
Thanks for providing me fantastic Construction-Manager study materials.
Thanks a lot actual tests.
Thank you!
I passed this Construction-Manager exam with very high score.
Disclaimer Policy: The site does not guarantee the content of the comments. Because of the different time and the changes in the scope of the exam, it can produce different effect. Before you purchase the dump, please carefully read the product introduction from the page. In addition, please be advised the site will not be responsible for the content of the comments and contradictions between users.
Our Exam4Labs Construction-Manager study material is specially designed for candidates like you for easy pass of the actual test. The Construction-Manager most relevant questions help you drill on key points you must know thoroughly. Besides, you will enjoy one year free update of the latest Construction-Manager training torrent. Thus you can master all the important information which will be occurred in the actual test. Passing the Construction-Manager real test is an easy thing.
Besides, we have money back guarantee policy that if you fail exam after purchasing our Construction-Manager practice test engine, we will full refund to you soon if you send us your failure score scanned and apply for refund. No Pass, Full Refund!
Yes, our Construction-Manager exam questions are certainly helpful practice materials. Our pass rate is 99%. Our Construction-Manager exam questions are compiled strictly. Our education experts are experienced in this line many years. We guarantee that our materials are helpful and latest surely. If you want to know more about our products, you can download our PDF free demo for reference. Also we have pictures and illustration for Self Test Software & Online Engine version.
Yes, We offer some discounts to our customers. There is no limit to some special discount. You can check regularly of our site to get the coupons.
All our products can share 365 days free download for updating version from the date of purchase. So don't worry. The exam materials will be valid for 365 days on our site.
All our products are the latest version. If you want to know details about each exam materials, our service will be waiting for you 7*24*365 online. Our exam products will updates with the change of the real Construction-Manager test. It is different for each exam code.
We have professional system designed by our strict IT staff. Once the Construction-Manager exam materials you purchased have new updates, our system will send you a mail to notify you including the downloading link automatically, or you can log in our site via account and password, and then download any time. As we all know, procedure may be more accurate than manpower.
No. After purchase, our system will set up an account and password by your purchasing information. You can use it directly or you can change your password as you like. No need to register an account yourself.
Self Test Software should be downloaded and installed in Window system with Java script. After purchase, we will send you email including download link, you click the link and download directly. If your computer is not the Window system and Java script, you can choose to purchase Online Test Engine. It is available for all device such Mac.
Yes, you can choose PDF version and print out. PDF version, Self Test Software and Online Test Engine cover same questions and answers. PDF version is printable.
Self Test Software can be downloaded in more than two hundreds computers. It is no limitation for the quantity of computers. So does Online Test Engine. You can use Online Test Engine in any device.
Yes, we have money back guarantee if you fail exam with our products. Applying for refund is simple that you send email to us for applying refund attached your failure score scanned. Money will be back to what you pay. Normally we support Credit Card for most countries. Our refund validity is 60 days from the date of your purchase. Our customer service is 365 days warranty. Users can receive our latest materials within one year.
Over 56295+ Satisfied Customers